I took the day off on Friday to work on the basement. I focused on the home theater area since we need to get the temporary theater room cleaned out and prepped for new new furniture and I have Dish coming in to setup our hopper system.
The theater experience is awesome. The system has never sounded better thanks to the ability to position speakers where I want them and the larger volume to let the sound develop. The bigger room does take more juice but with around 2200 watts we seem to be able to deliver that.
I probably need to do some more dressing or wires but I figured I’d let dish do their thing first and execute the planned tech upgrade I have this summer.
I got all equipment but the exercise stuff out of storage too. Heavy focus on drums today so I can get a practice in with my band!
A work in progress
Everything fit nicely
First test of the full system
Our contractor showed up just as I was ready to move to the projector. He built the interior box. Some trim is going to finish this off yet. I almost had a major issue here. The HDMI cable was long enough to get to the projector but not long enough to be pulled out of the box (I wasn’t thinking that the fit would be so tight). I was able to pull a few extra inches out…just enough to make it work!
No comments:
Post a Comment