Sunday, April 29, 2012

Moving in and Cleanup

Over the past couple of weekends we got the exercise room put together and the utility room cleaned up to the point of being able to put the right stuff in it. While it still feels like the process of moving into our home is dragging out for nearly 8 months now we are getting close!

IMG_2692IMG_2693IMG_2682IMG_2683IMG_2684IMG_2685IMG_2687IMG_2688IMG_2689IMG_2690

Saturday, April 14, 2012

Drums

I got the blue kit out today and got the black one wired up. Even had time for an online jam with the band! We had a river installed in our backyard as well.

IMG_2660IMG_2666

Home Theater

I took the day off on Friday to work on the basement. I focused on the home theater area since we need to get the temporary theater room cleaned out and prepped for new new furniture and I have Dish coming in to setup our hopper system.

The theater experience is awesome. The system has never sounded better thanks to the ability to position speakers where I want them and the larger volume to let the sound develop. The bigger room does take more juice but with around 2200 watts we seem to be able to deliver that.

I probably need to do some more dressing or wires but I figured I’d let dish do their thing first and execute the planned tech upgrade I have this summer.

I got all equipment but the exercise stuff out of storage too. Heavy focus on drums today so I can get a practice in with my band!

A work in progress

IMG_2651

Everything fit nicely

IMG_2652

IMG_2653

First test of the full system

IMG_2654

Our contractor showed up just as I was ready to move to the projector. He built the interior box. Some trim is going to finish this off yet. I almost had a major issue here. The HDMI cable was long enough to get to the projector but not long enough to be pulled out of the box (I wasn’t thinking that the fit would be so tight). I was able to pull a few extra inches out…just enough to make it work!

IMG_2655

Wednesday, April 11, 2012

Powered Up!

The electrician came today and finished the lights and power. I ‘m really happy with the lighting. The central vacuum worked too! I started to load in tonight. There is an amazing amount of dust on our stuff even though it was covered with tarps. The best part is that drumstinance had ended!! The bad news is I am way out of drumming shape. I only played for 5 minutes prior to curfew and my playing was stiff and off.

Bathroom finally has some light shed on it.

IMG_2635IMG_2637

The stair lights work great for nighttime movie viewing

IMG_2638

Future wet bar and theater area

IMG_2639

Future drum room (by future I mean hours from now)

IMG_2640

The LED lights under the counter are great…too bad the cabinets need moved and the lights need to be added to the built-in

IMG_2641

Theater area…these lights are to work on the equipment and but look great to accent the screen

IMG_2642

New view

IMG_2643

The columns are great

IMG_2644

From the future mixing desk view

IMG_2645

Bedroom

IMG_2646

The dust that got under the tarps is amazing…everything is getting cleaned

IMG_2648

The first stuff out of storage

IMG_2649

FINALLY!!

IMG_2650

Monday, April 9, 2012

Schedule

Found out today we are probably 3.5 weeks out for counters unless we can find the same stone somewhere else.

Sunday, April 8, 2012

Starting to look like something (and something I like to look at)

Carpet went down and it really makes a big difference on the perceived progress meter. I had a nice clean open surface to work on the screen too!

Wow…this looks inhabitable!

IMG_2616

Bar area

IMG_2617

Future drum room…may need some sound dampening due to a echo.

IMG_2618

Theater area

IMG_2619

Exercise room

IMG_2621

Bedroom/exercise room

IMG_2622

Yum yum!

IMG_2626

This is the sight that welcomed me home.

IMG_2613

Thursday, April 5, 2012

Finishing

Things are starting to shape up in the cosmetic department. Grout in the bathroom, the marble floor is in and the columns are mostly completed. Things are cleaned up and ready for the carpet to go in tomorrow. Electrical is supposed to be next week.

IMG_2599IMG_2600IMG_2601IMG_2602IMG_2603IMG_2604

Wednesday, April 4, 2012

Tuesday, April 3, 2012

Columns, Tile and Theater Wiring

Got quite a bit of work done on the columns today. The un-cut marble tiles were put down. I wrapped up my portion of the building work by finishing off the rear of the theater area.

Non cut tiles

IMG_2592

Columns!!

IMG_2593

Ready to rock.

IMG_2595IMG_2597

My Dad always told me to use the right tool for the job. That is the only comment I have on this one.

IMG_2594